
Sprinkler systems installed to pass final acceptance
New construction and retrofit installation for commercial and industrial buildings. Our licensed crews hang pipe on schedule and hand you a system built to pass the AHJ acceptance test the first time.

The crew that bids it is the crew that hangs it
On new construction we come in at rough-in, sleeve and coordinate with the other trades, and run mains and branch lines to the approved drawings. On an occupied building, retrofitting sprinklers is a different animal: we phase the work around tenants, keep egress open, and cut over to the new system with the shortest possible impairment.
Either way, you are not handed off. The licensed team that walks the job and prices it is the team that shows up, installs it, and stands in front of the fire marshal at acceptance.
Systems built for how the space is used
The hazard drives the design. A warehouse full of racked storage is not an office floor, and we install each to the standard it needs.
Office & Mixed-Use
Light-hazard wet systems for office floors, lobbies, and common areas, coordinated with ceiling grids so heads land clean.
Warehouse & Distribution
Storage-occupancy systems, including in-rack sprinklers and ESFR where the commodity and rack height call for it.
Industrial & Manufacturing
Systems built around process equipment and high-hazard areas.
Special Hazard Spaces
Data rooms, switchgear, and process equipment spaces where water alone is not the answer get a system matched to the hazard.
Special HazardsRetail & Restaurant
Sales-floor and back-of-house coverage sized for the build-out, coordinated with the tenant's fit-out schedule.
Parking & Unheated Areas
Dry-pipe and preaction systems for garages, canopies, and other spaces that see freezing temperatures.
What installation looks like on your job
A predictable sequence so you know what is happening and when.
Approved drawings and material on site
We build to the permitted design, order pipe, fittings, and heads, and stage material so the crew is never waiting on a delivery to keep moving.
Rough-in and mains
We hang mains and branch lines, set risers, and coordinate our routing with steel, duct, and conduit so nothing has to be cut back out later.
Trim and heads
Once ceilings and finishes are in, we set heads, escutcheons, and devices to the finished grid so the coverage matches the design and looks right overhead.
Hydrostatic test
We pressure-test the piping and hold it to confirm the system is tight before anything gets closed up behind drywall.
AHJ acceptance and turnover
We run the acceptance test with the authority having jurisdiction, get the system signed off, and hand over record drawings so it is ready for the inspection schedule that follows.
Ready to price the sprinkler package?
New building or an existing one that needs coverage, send us the plans and the schedule and we will put together a number. We answer emergencies 24/7.